Videos
Videos about our company, our products and services are clearly arranged here.
Gas transmission
Expansion and upgrade of the compressor station in Werne
The compressor station in Werne is the central hub in Germany’s natural gas grid. 13 pipelines from different directions meet at the site, transporting natural gas from the Netherlands, also referred to as L-gas, and natural gas from the North Sea, also known as H-gas, to the Ruhr region and further on south. About 25 billion m³ or roughly a quarter of the natural gas consumed in Germany every year passes through the compressor station in Werne.
The 2019 Rhine pipe laying
The Rhine pipe laying took place on 16 October 2019. The Rhine pipe weighs 1,050 tonnes, is 525 m long and runs 3.50 m below the riverbed. It took around four hours to lay the pipe.
Natural gas transmission: Modern pipeline construction
A new natural gas pipeline is under construction: from Rimpar in the North of Bavaria to Sannerz in Hesse. The pipeline route, with a length of about 67 kilometres, runs mainly through agricultural areas. (Video with German soundtrack)
Natural gas transmission: Flyover of pipeline project
Experience a bird’s eye view of the construction of the new Sannerz-Rimpar loop line in Bavaria, where around 67 kilometers of pipeline comprising 3,800 steel pipes cross steep slopes, rivers and railway tracks. (Video with German soundtrack)
Known how!
The OGE Hydrogen Guide
We believe in the supermolecule hydrogen as the basic building block of the energy system of the future! In the video the OGE Hydrogen Guide explains why we do so and which projects we are already planning today.